(UNPUBLISH) Track Records PTD

Power Transmission & Distribution
Over 40 Substations, Transmission Lines and Underground Cables up to 500kV local and overseas projects have been executed since 1997.

Overseas projects completed:

BANGLADESH

  • Turnkey contract for 230/132kV Substation at Rampura, Bangladesh
  • Extension of one complete 230kV Line Bay at Haripur 230/132kV Substation on Turnkey Basis.

SRI LANKA

  • Turnkey construction of a New 132/33kV Grid Substation at Hambantota and 2 x 132kV Line Bays at Embiliptiya, Sri Lanka.

THAILAND

  • Laem Chabang Port Project Supply & Construction of 15kV Substation
  • 115kV Substation, all Civil/Structural/Mechanical/Electrical Works Samut Prakarn (l mld) Wastewater Management Project.

VIETNAM

  • Turnkey Construction of 220kV Nha Be Substation and Extension of 220kV Phu Lam Substation under Phu My 1 Power Project.
  • Supply of Materials & Equipment for 110kV Ben Thuy Substation and Feeder at 220kV Vinh Substation

Local Projects completed:

  • (TNB) – Phase 4 – 500kV System Development at Air Tawar And Bukit Tarek Extension.
  • (TNB) – Establishment Of 275/132/33kV Puchong Perdana Substation.
  • (TNB) – Proposed 275kV (1000MVA) Transmission Line From Olak Lempit To Puchong Perdana.
  • (TNB) – 275kV Switching Station at PMU Sedenak, Johor.
  • (TNB) – 90MVA 132k/32kV Transformer and 1X30MVAR Capacitor Bank at PMU Panchor, Kelantan.
  • (TNB) – The Enhancement of TNB’s Fiber Optic Network Phase 8 – Mainhead D.
  • (TNB) – The Enhancement of TNB’s Fiber Optic Network Phase 7 (Stage 1) – Eastern.
  • (TNB) – Establishment Of PMU 132/33kV Danga Bay (GIS).
  • (TNB) – Establishment Of PMU 275/230kV Plentong, Johor (Phase 2).
  • (SESB) –  Sabah Nothern Grid project
  • (SESB) –  Extension from Kota Kinabalu to Kudat, Sabah (to SESB).
  • (SESCO) – Kuching EHV Outer Ring Project For Switchgears, Cables & Ancillary Equipment.

Job Summary


1. To actively attend project sites to assist the Project Manager in all civil aspects related to the construction of Substations.
2. To assist the Project Manager in all civil aspects up to the completion of projects.
3. To assist the division in tender preparation especially on the pricing of civil related e.g equipment and construction.
4. To implement all procedure and practices as stipulated in the Company’s policy, including ISO and Safety.
5. To provide good assistance before and during internal/external audit by ensuring all related documents at site is updated from time to time.

 

Duties and Responsibilities


1. To resolve site problems and working closely with Project Manager, Client, Supervisor/Engineer, site workers on all related parties.
2. To liaise with and resolve all civil issue with consultant/client.
3. To closely monitor site activities and ensure works are carried out as per plan and with highest quality/standard.
4. To calculate the required materials quantity to be purchased and ensure the materials are sent at site timely.
5. To prepare and check a progress claim and/or report to the client, complete with preparation if quantity taking off and always keep on until the progress claim is paid by the client.
6. To attend field and witness material tests and all related tests carried out as per required in the project/contract or specifications.
7. To prepare Method of Statement and any related technical required as per requested by client/consultant/company.
8. To attend Project Monthly Progress Meeting including Safety Meeting.
9. To prepare all site audit requirement and attend the audit and close any comment/NCR issued (if any).
10. To prepare and manage local authority’s submission, etc.
11. To provide calculation and pricing for civil portion of all tenders to be participate by the division.
12. To review pricing and equipment provided by sub contractors and supplier.
13. To update, maintain and achieve all related documents/manual/records/correspondences as required for ISO 9001:2015/45001:2018.
14. Ensure that all statutory requirements including Safety and Health etc. are fully complied as per OSH 18001:2007/45001:2018, etc.
15. Implementation of company procedures and practice at site.
16. Attend to auditor’s queries (internal/external).
17. To ensure organized filing system in order to have easy retrieval of all related documents.
18. Able to coordinate closely with all levels of staff to meet tight deadlines.
19. Build and maintain positive working relations with co-workers, relevant stakeholders and the public using principles of good customer service.
20. To perform any other relevant task as assigned by the Project Manager.