Track Records

Power Transmission & Distribution

Over 40 Substations,Transmission Lines And Underground Cables up to 500kV local and overseas projects have been executed since 1997.

Overseas projects completed:

  • Turnkey contract for 230/132kV Substation at Rampura, Bangladesh.
  • Turnkey construction of a New 132/33kV Grid Substation at Hambantota and 2 x 132kV Line Bays at Embiliptiya, Sri Lanka.
  • Turnkey Construction of 220kV Nha Be Substation and Extension of 220kV Phu Lam Substation under Phu My 1 Power Project.
  • Laem Chabang Port Project (115kV) Substation in Thailand (Mozaic Panel).

Local Projects completed:

  • Phase 4 – 500kV System Development at Air Tawar And Bukit Tarek Extension.
  • 500kV/275kV Ayer Tawar S/S.
  • 500kV Bukit Tarek S/S.
  • Establishment Of 275/132/33kV Puchong Perdana Substation.
  • Proposed 275kV (1000MVA) Transmission Line From Olak Lempit To Puchong Perdana.
  • Sabah Nothern Grid Project.
  • Kuching EHV Outer Ring Project For Switchgears, Cables & Ancillary Equipments.
  • Various 132kV Substations.

Switchgears & Controls

Projects:

  • 275kV Tuanku Jaafar Power Station.
  • 275/132/33kV Samalaju S/S.

Project In Hand:

  • 500kV Extension at Janamanjung substation.
  • 500kv Gas Insulated Line at Janamanjung substation (JV with Siemens Malaysia).